Starting with the Floor

The boat deck has been stripped bare and is ready for the installation of new flooring. Rolls of outdoor flooring from Chilewich arrived and we laid them out to check for flaws. Before laying the flooring, we filled in the previous holes and gave the deck a good cleaning. Now it's time to lay the foundation for the rest of this pontoon boat remodel.



Featured Posts
Recent Posts
Search By Tags
No tags yet.
Follow Us
  • Facebook Classic
  • Twitter Classic
  • Google Classic

SKP Design

8240 Stadium Drive, Kalamazoo, MI 49009

400 136th Street, Suite 520, Holland, MI 49424

269-377-6645

  • Facebook - Black Circle
  • Instagram - Black Circle
  • Twitter - Black Circle
  • LinkedIn - Black Circle
  • Pinterest - Black Circle
  • Houzz - Black Circle
  • YouTube - Black Circle
  • Mortarr - BlackCircle